Itaú Unibanco
Brazil's largest private bank · Industrial facilities
Verified · Industrial38.3% Energy Reduction. Two Facilities. Zero Downtime.
Flowāv capacitive filters were installed in parallel with the existing electrical networks at both facilities. The installation did not require operations to stop. Both facilities recorded measurable savings after deployment.
23,773 → 20,388 kWh/mo
8,971 → 6,168 kWh/mo
parallel install
maintenance reduced