Does Flowāv replace the electrical panel?
No. It is added in parallel to the existing system according to the approved installation design.
Can the unit be mounted inside any environment?
The location must meet the product’s temperature, ventilation, ingress-protection, enclosure, and code requirements. Harsh environments may require an IP65/NEMA 4X listed enclosure.
Does the building need to be shut down?
Electrical work must be de-energized and performed under proper lockout/tagout procedures. The scope and duration of any shutdown depend on the panel, site safety rules, and the electrician’s plan.
What should be checked if savings are not visible?
Verify power to the unit, LED status, grounding below 10 ohms, correct parallel wiring, correct project sizing, operating conditions, and the measurement period used to compare performance.
What information is needed to size the project?
Recent utility usage, voltage, phase, panel information, major loads, operating hours, and any available power-quality or one-line-diagram data.
Where can an installer see the full technical requirements?
Use the official FL1V3 US Standards Manual and the project-specific electrical design. Download the manual →