38.3% Energy Reduction. Two Facilities. Zero Downtime.
Two Itaú Unibanco facilities were experiencing escalating energy costs driven by harmonic distortion and electromagnetic interference across their electrical networks — a common but under-diagnosed problem in large industrial environments.
Solution: Flowāv Capacitive Filters were installed in parallel with the existing electrical networks at both facilities. The parallel installation meant operations never paused — zero downtime throughout the entire process.
Outcome: Substantial and sustained cost savings at both facilities. Equipment reliability improved significantly with reduced maintenance frequency. Results were immediate and have been sustained continuously since installation.